Your Security “Requirements” are Teh Suxxorz

Posted July 1st, 2009 by

Face it, your security requirements suck. I’ll tell you why.  You write down controls verbatim from your catalog of controls (800-53, SoX, PCI, 27001, etc), put it into a contract, and wonder how come when it comes time for security testing, we just aren’t talking the same language.  Even worse, you put in the cr*ptastic “Contractor shall be compliant with FISMA and all applicable NIST standards”.  Yes, this happens more often than I could ever care to count, and I’ve seen it from both sides.

The problem with quoting back the “requirements” from a catalog of controls is that they’re not really requirements, they’re control objectives–abstract representations of what you need in order to protect your data, IT system, or business.  It’s a bit like brain surgery using a hammer and chisel–yes, it might work out for you, but I don’t really feel comfortable doing it or being on the receiving end.

And this is my beef with the way we manage security controls nowadays.  They’re not requirements, functionally they’re a high-level needs statement or even a security concept of operations.  Security controls need to be tailored into real requirements that are buildable, testable, measurable, and achievable.

Requirements photo by yummiec00kies.  There’s a social commentary in there about “Single, slim, and pleasant looking” but even I’m afraid to touch that one. =)

Did you say “Wrecks and Female Pigs’? In the contracting world, we have 2 vehicles that we use primarily for security controls: Statements of Work (SOW) and Engineering Requirements.

  • Statements of Work follow along the lines of activities performed by people.  For instance, “contractor shall perform monthly 100% vulnerability scanning of the $FooProject.”
  • Engineering Requirements are exactly what you want to have build.  For instance, “Prior to displaying the login screen, the application shall display the approved Generic Government Agency warning banner as shown below…”

Let’s have a quick exercise, shall we?

What 800-53 says: The information system produces audit records that contain sufficient information to, at a minimum, establish what type of event occurred, when (date and time) the event occurred, where the event occurred, the source of the event, the outcome (success or failure) of the event, and the identity of any user/subject associated with the event.

How It gets translated into a contract: Since it’s more along the lines of a security functional requirement (ie, it’s a specific functionality not a task we want people to do), we brake it out into multiple requirements:

The $BarApplication shall produce audit records with the following content:

  • Event description such as the following:
    • Access the $Baz subsystem
    • Mounting external hard drive
    • Connecting to database
    • User entered administrator mode
  • Date/time stamp in ‘YYYY-MM-DD HH:MM:SS’ format;
  • Hostname where the event occured;
  • Process name or program that generated the event;
  • Outcome of the event as one of the following: success, warn, or fail; and
  • Username and UserID that generated the event.

For a COTS product (ie, Windows 2003 server, Cisco IOS), when it comes to logging, I get what I get, and this means I don’t have a requirement for logging unless I’m designing the engineering requirements for Windows.

What 800-53 says: The The organization configures the information system to provide only essential capabilities and specifically prohibits and/or restricts the use of the following functions, ports, protocols, and/or services: [Assignment: organization-defined list of prohibited and/or restricted functions, ports, protocols, and/or services].

How It gets translated into a contract: Since it’s more along the lines of a security functional requirement, we brake it out into multiple requirements:

The $Barsystem shall have the software firewall turned on and only the following traffic shall be allowed:

  • TCP port 443 to the command server
  • UDP port 123 to the time server at this address
  • etc…..

If we drop the system into a pre-existing infrastructure, we don’t need firewall rules per-se as part of the requirements, what we do need is a SOW along the following lines:

The system shall use our approved process for firewall change control, see a copy here…

So what’s missing, and how do we fix the sorry state of requirements?

This is the interesting part, and right now I’m not sure if we can, given the state of the industry and the infosec labor shortage:  we need security engineers who understand engineering requirements and project management in addition to vulnerability management.

Don’t abandon hope yet, let’s look at some things that can help….

Security requirements are a “best effort” proposition.  By this, I mean that we have our requirements and they don’t fit in all cases, so what we do is we throw them out there and if you can’t meet the requirement, we waiver it (live with it, hope for the best) or apply a compensating control (shield it from bad things happening).  This is unnerving because what we end up doing is arguing all the time over whether the requirements that were written need to be done or not.  This drives the engineers nuts.

It’s a significant amount of work to translate control objectives into requirements.  The easiest, fastest way to fix the “controls view” of a project is to scope out things that are provided by infrastructure or by policies and procedures at the enterprise level.  Hmmm, sounds like explicitly stating what our shared/common controls are.

You can manage controls by exclusion or inclusion:

  • Inclusion:  We have a “default null” for controls and we will explicitly say in the requirements what controls you do need.  This works for small projects like standing up a pair of webservers in an existing infrastructure.
  • Exclusion:  We give you the entire catalog of controls and then tell you which ones don’t apply to you.  This works best with large projects such as the outsourcing of an entire IT department.

We need a reference implementation per technology.  Let’s face it, how many times have I taken the 800-53 controls and broken them down into controls relevant for a desktop OS?  At least 5 in the last 3 years.  The way you really need to do this is that you have a hardening guide and that is the authoritative set of requirements for that technology.  It makes life simple.  Not that I’m saying deviate from doctrine and don’t do 800-53 controls and 800-53A test procedures, but that’s the point of having a hardening guide–it’s really just a set of tailored controls specific to a certain technology type.  The work has been done for you, quit trying to re-engineer the wheel.

Use a Joint Responsibilities Matrix.  Basically this breaks down the catalog of controls into the following columns:

  • Control Designator
  • Control Title
  • Provided by the Government/Infrastructure/Common Control
  • Provided by the Contractor/Project Team/Engineer


Similar Posts:

Posted in BSOFH, Outsourcing, Technical | 3 Comments »
Tags:

Some Thoughts on POA&M Abuse

Posted June 8th, 2009 by

Ack, Plans of Action and Milestones.  I love them and I hate them.

For those of you who “don’t habla Federali”, a POA&M is basically an IOU from the system owner to the accreditor that yes, we will fix something but for some reason we can’t do it right now.  Usually these are findings from Security Test and Evaluation (ST&E) or Certification and Accreditation (C&A).  In fact, some places I’ve worked, they won’t make new POA&Ms unless they’re traceable back to ST&E results.

Functions that a POA&M fulfills:

  • Issue tracking to resolution
  • Serves as a “risk register”
  • Used as the justification for budget
  • Generate mitigation metrics
  • Can be used for data-mining to find common vulnerabilities across systems

But today, we’re going to talk about POA&M abuse.  I’ve seen my fair share of this.

Conflicting Goals: The basic problem is that we want POA&Ms to satisfy too many conflicting functions.  IE, if we use the number of open POA&Ms as a metric to determine if our system owners are doing their job and closing out issues but we also turn around and report these at an enterprise level to OMB or at the department level, then it’s a conflict of interest to get these closed as fast as possible, even if it means losing your ability to track things at the system level or to spend the time doing things that solve long-term security problems–our vulnerability/weakness/risk management process forces us into creating small, easily-to-satisfy POA&Ms instead of long-term projects.

Near-Term v/s Long-Term:  If we set up POA&Ms with due dates of 30-60-90 (for high, moderate, and low risks) days, we don’t really have time at all to turn these POA&Ms into budget support.  Well, if we manage the budget up to 3 years in advance and we have 90 days for high-risk findings, then that means we’ll have exactly 0 input into the budget from any POA&M unless we can delay the bugger for 2 years or so, much too long for it to actually be fixable.

Bad POA&Ms:  Let’s face it, sometimes the one-for-one nature of ST&E, C&A, and risk assessment findings to POA&Ms means that you get POA&Ms that are “bad” and by that I mean that they can’t be satisfied or they’re not really something that you need to fix.

Some of the bad POA&Ms I’ve seen, these are paraphrased from the original:

  • The solution uses {Microsoft|Sun|Oracle} products which has a history of vulnerabilities.
  • The project team needs to tell the vendor to put IPV6 into their product roadmap
  • The project team needs to implement X which is a common control provided at the enterprise level
  • The System Owner and DAA have accepted this risk but we’re still turning it into a POA&M
  • This is a common control that we really should handle at the enterprise level but we’re putting it on your POA&M list for a simple web application

Plan of Action for Refresh Philly photo by jonny goldstein.

Keys to POA&M Nirvana:  So over the years, I’ve observed some techniques for success in working with POA&Ms:

  • Agree on the evidence/proof of POA&M closure when the POA&M is created
  • Fix it before it becomes a POA&M
  • Have a waiver or exception process that requires a cost-benefit-risk analysis
  • Start with”high-level” POA&Ms and work down to more detailed POA&Ms as your security program matures
  • POA&Ms are between the System Owner and the DAA, but the System Owner can turn around and negotiate a POA&M as a cedural with an outsourced IT provider

And then the keys to Building Good POA&Ms:

  • Actionable–ie, they have something that you need to do
  • Achievable–they can be accomplished
  • Demonstrable–you can demonstrate that the POA&M has been satisfied
  • Properly-Scoped–absorbed at the agency level, the common control level, or the system level
  • They are SMART: Specific, Manageable, Attainable, Relevant, and within a specified Timeframe
  • They are DUMB: Doable, Understandable, Manageable, and Beneficial

Yes, I stole the last 2 bullets from the picture above, but they make really good sense in a way that “know thyself” is awesome advice from the Oracle at Delphi.



Similar Posts:

Posted in BSOFH, FISMA | No Comments »
Tags:

NIST Framework for FISMA Dates Announced

Posted April 10th, 2009 by

Some of my friends (and maybe myself) will be teaching the NIST Framework for FISMA in May and June with Potomac Forum.   This really is an awesome program.  Some highlights:

  • Attendance is limited to Government employees only so that you can talk openly with your peers.
  • Be part of a cohort that trains together over the course of a month.
  • The course is 5 Fridays so that you can learn something then take it back to work the next week.
  • We have a Government speaker ever week, from the NIST FISMA guys to agency CISOs and CIOs.
  • No pitching, no marketing, no product placement (OK, maybe we’ll go through DoJ’s CSAM but only as an example of what kinds of tools are out there) , no BS.

See you all there!



Similar Posts:

Posted in NIST, Speaking | 1 Comment »
Tags:

Certification and Accreditation Seminar, March 30th and 31st

Posted March 13th, 2009 by

We’ve got another good US Government Security Certification and Accreditation (C&A) Seminar/Workshop coming up at the end of March with Potomac Forum.

Graydon McKee (Ascension Risk Management and associated blog) and Dan Philpott (Fismapedia Mastermind and Guerilla-CISO Contributor) are going to the core of the instruction, with a couple others thrown in to round it all out.  I might stop by if I have the time.

What we promise:

  • An opportunity to hear NIST’s version of events and what they’re trying to accomplish
  • An opportunity to ask as many questions as you possibly can in 2 days
  • Good materials put together
  • An update on some of the recent security initiatives
  • An opportunity to commiserate with security folks from other agencies and contractors
  • No sales pitches and no products

See you all there!



Similar Posts:

Posted in FISMA, NIST, Speaking | No Comments »
Tags:

Your Friendly Neighborhood C&A Podcast Panel

Posted February 17th, 2009 by

This weekend, Joe Faraone (Vlad the Impaler), Graydon Mckee, and I teamed up to be a guest panel for Michael Santarcangelo’s Security Catalyst podcast.  We wax esoterically on the fine points of certification and accreditation and what kind of value that it brings to an agency or company that does it right.

You can check it out here.



Similar Posts:

Posted in Speaking, What Works | No Comments »
Tags:

The Authorizing Official and the Lolcat

Posted February 12th, 2009 by

Hot on the heels of our DAA presentation, the Guerilla CISO is proud to present our lolcat Authorizing Official.

Yes, it’s all about the budget. If you do not have a budget, you do not have the ability to change things. We have a word for people who have all the authority of an Authorizing Official but none of the budget: scapegoat.

funny pictures

And since I’m in Toronto for an extended stay thanks to the weather, today is a 2-fer:
funny pictures



Similar Posts:

Posted in IKANHAZFIZMA | No Comments »
Tags:

« Previous Entries Next Entries »


Visitor Geolocationing Widget: